F ffbh New member Dec 30, 2023 #1 What I'm going to do is disconnect "idle" task from "Return Success". 1. create a new task 2. connect "Idle" to the new task 3. delete the new task it takes 3 steps to so, which are very slow if I have lots of tasks need to be disconnected from his parent.
What I'm going to do is disconnect "idle" task from "Return Success". 1. create a new task 2. connect "Idle" to the new task 3. delete the new task it takes 3 steps to so, which are very slow if I have lots of tasks need to be disconnected from his parent.